Appflow Glue Orchestration

0

We have a usecase where two appflows that should trigger one glue model, The glue model takes more than 5 minutes to complete its run but by the time the glue job is running, we have a second job run already triggered via the second appflow or a second run cycle of the appflow. This results in the job run failure with an error msg as Max concurrent runs exceeded. Do we have any mechanism on Eventbridge or Glue in such a way that we can put the next job in a queue in case of the concurrent run? or Is there any other solution available apart from Eventbridge that can be used to achieve the same? Appreciate any inputs here.Thanks

질문됨 5달 전63회 조회
답변 없음

로그인하지 않았습니다. 로그인해야 답변을 게시할 수 있습니다.

좋은 답변은 질문에 명확하게 답하고 건설적인 피드백을 제공하며 질문자의 전문적인 성장을 장려합니다.

질문 답변하기에 대한 가이드라인

관련 콘텐츠