Appflow Glue Orchestration

0

We have a usecase where two appflows that should trigger one glue model, The glue model takes more than 5 minutes to complete its run but by the time the glue job is running, we have a second job run already triggered via the second appflow or a second run cycle of the appflow. This results in the job run failure with an error msg as Max concurrent runs exceeded. Do we have any mechanism on Eventbridge or Glue in such a way that we can put the next job in a queue in case of the concurrent run? or Is there any other solution available apart from Eventbridge that can be used to achieve the same? Appreciate any inputs here.Thanks

已提问 5 个月前63 查看次数
没有答案

您未登录。 登录 发布回答。

一个好的回答可以清楚地解答问题和提供建设性反馈,并能促进提问者的职业发展。

回答问题的准则